Cameron Road Improvements

Cameron Road Improvements

Widen and realign existing 2-lane road to 4-lane arterial from Howard Lane to SH 130

Current Phase

Precinct Location

Sponsored by Precinct One

Project Description

The purpose of the proposed project is to improve mobility in the area and enhance public safety on Cameron Road. The existing roadway is undivided with one travel lane in each direction with no shoulders. The proposed project would construct two travel lanes in each direction with bike lanes curb and gutter and sidewalks on both sides of the road. Planned improvements also include a bridge and the realignment of Cameron Road beginning at approximately 0.25 miles south of its intersection with SH 130 before transitioning back to parallel the existing alignment approximately 0.18 miles south of Killingsworth Lane. This will essentially remove the hard turn in the road.

Funding Source

2011 bond funds